Workforce · scheduling
A rota carries money, and it becomes timesheets.
Every entry carries its pay type and job code. The schedule carries a budget. And when the week ends, it becomes timesheets.
Before the week is published
One keeps the shape of the week, one the sequence
On the slot and on the entry
Trusted by the Caribbean’s best-known employers
Airlines, telecoms, utilities, hotels, credit unions and the National Insurance Board itself.

What a schedule carries
Before you place a single shift, the schedule holds four things that decide how it behaves.
A budget, a name and a date range
Watch the budget. A rota is a spending decision made a week ahead, and in most operations nobody sees what it cost until afterwards, in the run.
Put the budget on the schedule and the number sits in front of the person building it, while the shifts can still move.
Named shift managers, and scope
A schedule is scoped by division, department, employment level and work title, so a property schedules its own people without seeing everyone else’s.
For a group running several properties, that’s more than a convenience. It’s the difference between a manager who can build a rota and one who has to wait for a filtered export.
Reusable shift slots
A named slot with a start, an end, a colour, a pay type, an optional job code, and an overnight flag. Build the library once. Drag it onto the grid after that.
Colour does more work than it looks. A grid of names and times is unreadable at a glance, and a supervisor always checks a rota at a glance.
An entry knows what it costs
Here scheduling stops being a planning exercise. It becomes payroll data.
Each entry carries its pay type and its job code, so hours land on the right line when the schedule becomes a timesheet. An entry can also be marked as scheduled overtime with its own hours, before anyone works it.
Scheduled overtime matters. Overtime you planned and overtime that just happened are different facts. If you can’t tell them apart, you can’t tell whether you’re over-running or under-staffed.
Overnight shifts are a first-class case
On the slot and on the entry. In hospitality that’s most of the back half of the rota, and a system that treats midnight as the end of something is wrong about a third of the week.
A schedule becomes timesheets, and that’s where Workforce meets Payroll. Overtime thresholds are then applied per employment level, which we cover on time, timesheets and overtime.

Two cloning strategies, and the difference matters
Copying a rota is the job people do most in this module. So choosing between these two is most of the feature.
Weekday-aligned suits a business with a steady week. If Sunday is quiet and Friday is heavy, next Sunday should be quiet and next Friday heavy. And a blank Monday should stay blank.
Sequential suits a rotating operation. A crew working a pattern that doesn’t line up with the calendar week needs the pattern carried on. Clone that rota weekday-aligned and you get a schedule that looks right, with the wrong people on the wrong days.
Publish notifies, and an unpublished schedule is a draft
Nobody has been told about an unpublished rota. Sounds obvious. It’s still the most common scheduling failure we see. A rota gets built, looks finished on the screen, and never gets published, so half the team works from last week’s.
For a site that already plans in a spreadsheet, a schedule can be imported using a downloadable template. That’s the sensible first step if you’re not ready to change how you plan, only where the plan lives.
The settings that make it behave
All of these are set per account. Together they decide how a scheduled shift and a real punch relate.
Clocking windows
- How early someone may clock in
- A late clock-in grace period
- How late they may clock out
Think hardest about the grace period. It decides how much of your exception reporting is real.
Hours and breaks
- A lunch break period
- A time-worked threshold
- Whether to clock out automatically at the end of a scheduled shift
Automatic clock-out fixes the most common data problem in attendance: the shift nobody closed.
What people see and may do
- Whether to show estimated pay
- Whether to allow unscheduled overnight shifts
Showing estimated pay on a roster is a real decision. Make it on purpose.
And four notification types: late, early, overtime and unscheduled clock-ins. Each one means a supervisor finds out on the day, which is the only time any of them can still be fixed.
What it doesn’t do
No auto-scheduling, no forecasting, no optimisation engine
The schedule is built by a person who knows the business. There is no demand forecast, no algorithm proposing a rota, and no optimiser rearranging one to hit a number.
We chose that. Automated scheduling works where demand is measurable and staff are interchangeable, and in most of the operations we serve, neither is true. Who can cover the bar on a Saturday. Who’s training whom. Who has asked not to be rostered with whom. Those facts live with the supervisor.
So the product makes the human decision cheap to repeat and hard to get wrong quietly. A slot library, so nothing is retyped. Two cloning strategies, so last week is your starting point. A budget on the schedule, so you see the cost while it can still change. And publishing that tells people.
Articles
Further reading
A rota carries money before anyone works it
Publish a shift and you’ve committed the cost.
Read the article ArticleCoverage across sites, and the gaps a spreadsheet hides
One sheet per location is how a Saturday goes uncovered.
Read the article ArticleFrom published rota to timesheet without retyping
The schedule and the hours should be the same record.
Read the articleQuestions about scheduling
What is the difference between the two cloning options?
Can a schedule show what it will cost?
Do overnight shifts work properly?
Who can see and build a schedule?
Does the schedule become timesheets?
Can we import a rota we already build in a spreadsheet?
See it on your own data
Bring next week’s rota the way you build it today. We’ll import it, clone it both ways and show you what the budget says.
- A slot library built once and dragged onto the grid
- Both cloning strategies run on the same week
- An overnight shift crossing midnight as one entry
- The schedule becoming timesheets with pay types intact
- SOC 2 Type II attested
- AES-256 at rest
- 99.9% uptime
- Built in The Bahamas
Where to go next
Scheduling sits inside Workforce, between the people and the pay run. These are the pages around it.
Scheduling is part of the Workforce module. Security: AES-256 at rest via AWS KMS, TLS 1.2 and above in transit, SOC 2 Type II attested against the Security criteria with the report available under NDA, and AWS US multi-AZ as standard with on-premises or Caribbean regional cloud on request, subject to scoping. See also Core HR, Payroll and Talent · the six territories · contact.
