Industries · field services and construction

The crew is never where the office is. And the cost belongs to the job.

Aspire and Landscape Management Network are named import routes here. This industry is the reason they exist.

Named import routes
Eight

Including the two field-services systems

A job site is
A division

With its own geofence radius and GL code

An import rolls back
Before approval, once

Draft or pending approval, and one attempt

A tower crane over a building frame, with a crew van and traffic cones on the road

Trusted by the Caribbean’s best-known employers

Airlines, telecoms, utilities, hotels, credit unions and the National Insurance Board itself.

What a field operation does that ordinary payroll software can’t follow

Five problems you deal with every week. For each one, what we built for it and the page that shows how it works.

We read the file your existing system already produces

The usual advice to a field-services employer is to replace the system the operation actually runs on, just so payroll works. You don’t have to.

The eight named import routes
GroupNamed
Time and attendance systemsTimeForce, uAttend, TimeMoto
Workforce platformsDeputy, TimeClock Plus
Field servicesAspire, Landscape Management Network
GenericAn Excel layout

Aspire and Landscape Management Network are on that list because of this industry. If you run landscaping or grounds maintenance with job costing in one of them, you’re not going to drop it to get payroll right.

And nobody should ask you to.

All eight routes, and what each is for

The import previews before it commits, and rolls back after

A batch is staged and previewed before anything commits, so the rows are visible while they’re still a proposal.

And it can be undone, within two bounds: only while the pay run is draft or pending approval, and once. A batch that has been rolled back refuses a second attempt.

"You can undo an import" invites the question. "Before approval, once" answers it.

The pre-run review and approval

Cost follows the work

The accounting export splits payroll cost by division, by department and by island, and every line carries its GL code. Each site is a division, so eleven sites are eleven divisions and the labour at each arrives on its own lines.

For the pay types you choose, the division comes from the timesheet line. That’s the whole idea. Hours booked at a site carry their cost with them, so the labour lands against the work.

Those GL codes are fields that travel into the accounting export file, including a Sage-ready sheet. There’s no push into anyone's ledger.

Cost splits and the accounting export

A site is a division

In this product, divisions are the physical sites. Each one carries a latitude, a longitude, a map address, a geofence radius in metres and a GL code. There’s no separate locations table.

So the setup is simple. A contractor running eleven active sites sets up eleven divisions. That’s how you’d actually build it anyway.

An out-of-fence punch is flagged, or refused, as you set it. It ships set to refuse. A punch with no location at all is refused either way. For crews spread across sites we’d set it to accept: the punch stands, recorded and flagged with a notification, and a supervisor has an exception to ask about.

What the geofence does and does not do

A foreman and a labourer don’t share an overtime rule

Five thresholds, daily, weekly, bi-weekly, semi-monthly and monthly, each set per employment level.

An account with one threshold makes a single rule serve both, and it’s quietly wrong for one of them every period. On a crew where the foreman is salaried and the labourers aren’t, that error is built in.

Five thresholds, per employment level
app.triblockhr.com/payroll/cost-splits
The cost split settings screen, versioned by effective date
Cost split settings, versioned by effective date, each carrying its GL code.

Scheduling a crew that moves

The rota feeds everything above. So it’s worth knowing what it carries before the hours reach a run.

A schedule is scoped by division, department, employment level and work title, so a site supervisor builds their own site's rota and sees their own crew. Reusable slots carry a pay code and a job code, and that’s what lets the hours land on the right line.

A schedule also carries a budget. So the person building the week sees what it costs while the shifts can still move.

Gilgan Company and Caribbean Landscaping are clients.

What we don’t do

We pay the crew and put the cost where the work was

There’s no job costing beyond payroll cost allocation, no estimating, no quoting, no fleet or equipment tracking and no dispatch.

That line is why the import routes matter. The system that estimates the job, schedules the truck and tracks the machine stays exactly where it is, and we read the hours out of it.

The labour cost is the part that goes wrong. Somebody allocates it by hand, after the fact, from a spreadsheet they maintain. Put the cost where the work was, on the run that paid for it, and the reconciliation stops being a monthly exercise.

app.triblockhr.com/payroll/hours/import
An hours import in TriblockHR previewing before it commits: 8 valid rows and 0 errors, the overtime hours it will add for each employee, and Apply 8 entries not yet pressed, over a monthly pay run still in draft.
An hours import previewing before it commits: valid rows, errors, and the overtime each employee gains.

Questions field operations ask

Do we have to replace the system that runs our operation?
No. That’s the whole point of the named routes. Aspire and Landscape Management Network are two of eight, alongside TimeForce, uAttend, TimeMoto, Deputy, TimeClock Plus and a generic Excel layout. We read the file your existing system already produces.
Can an hours import be undone?
Yes, within two bounds. Only while the pay run is draft or pending approval, and only once. A batch that has been rolled back refuses a second attempt. The import also previews before it commits, so you see the rows while they’re still a proposal.
How does labour cost reach the right job?
The accounting export splits cost by division, by department and by island, and every line carries its GL code. For the pay types you choose, the division is taken from the timesheet line, so hours booked at a site carry their cost with them.
Do the GL codes post into our accounting system?
No. A GL account code is a field that travels into the accounting export file, including a Sage-ready sheet. There’s no push into anyone’s ledger. Sage is just the name of the sheet format. No accounting product is integrated, Sage included.
How do we configure our job sites?
Each site is a division, carrying a latitude, a longitude, a map address, a geofence radius in metres and a GL code. There’s no separate locations table. A contractor running eleven active sites sets up eleven divisions, which is how you’d actually build it.
Does the geofence stop a punch from the wrong place?
It can. Set to refuse, which is how it ships, a punch outside the fence doesn’t go through. Set to accept, it’s recorded and flagged with a notification, and the punch stands. A punch with no location at all is refused either way.

Bring a file from the system you already run

And a week of hours across two sites. The import preview is the fastest way to see whether this fits.

  • An import from your own field-services file, previewed
  • A rollback while the run is still draft
  • A cost split resolving from the timesheets
  • Eleven sites configured as eleven divisions
  • SOC 2 Type II attested
  • AES-256 at rest
  • 99.9% uptime
  • Built in The Bahamas

Tell us about your payroll

A few details first, so the demo runs on your territories and your size.

Where do you run payroll?

Already running payroll on TriblockHR

  • Bahamasair
  • Bahamas Telecommunications Company
  • National Insurance Board
  • Gilgan Company