When an employee’s work permit expires partway through a pay period, that month’s run stops being one question and becomes two. This guide follows one invented employee through the decisions an employer has to take, in the order they have to be taken, before the run is approved.
Permits are a matter for the Department of Immigration. The contribution that applies whatever the permit status is set by the National Insurance Board: 4.65% from the employee and 6.65% from the employer. Effective 1 July 2024 · verified 16 September 2026
What a lapse does
The consequence is simple to state. A lapsed permit stops the employee working, and paying them as though they were working does not cure it. The permit is what allows the work; wages are not a substitute for it. The exposure is the employer’s as well as the individual’s, which is why the decisions below sit with the employer and not with the employee alone.
Take an invented employee, Rafael, a quantity surveyor at an invented contractor, Bluehole Contracting. He is paid monthly, on a period that runs from the 1st to the 30th, with the run approved on the 25th. His annual permit expires on 10 April. Nobody notices until 14 April, when a site manager asks why his renewal paperwork has not come back.
By then the April run is eleven days away, and four of Rafael’s working days already fall after the expiry date. What happens next is a sequence, and the order matters more than speed.
The period splits at the expiry date
The expiry date in the record divides April into two parts. Days 1 to 10 fall inside a valid permit. Days 11 to 30 do not. These are not one question with a complication; they are two different questions, and treating the month as a single block is how the mistake gets made.
The first part is ordinary. Rafael worked under a valid permit, and those days are processed like any other employee’s. The second part is where every hard question sits: whether he may work at all, what follows for the days he has already worked since the 10th, and what is owed for the rest of the month. Keeping the two parts separate in the record from the start means that whatever the answer to the second turns out to be, the first is not held up waiting for it.
Before the run: the order of steps
Before the April run is approved, the employer works through these in order:
- Record when the lapse was discovered and by whom. 14 April, by the site manager. This is the start of the employer’s own timeline, and it will be asked for.
- Stop scheduling Rafael from the expiry date. He comes off the rota from 11 April. Days he has already worked since then are recorded as they happened; the record of what took place is not rewritten.
- Check whether a renewal was filed, and when. Find the renewal application, the date it went in, any acknowledgement from the Department, and the Labour Certificate if his permit’s fee scale requires one.
- Ask the Department of Immigration about this specific permit, and get the answer in writing. A general rule heard second-hand is not an answer about Rafael’s permit.
- Only then approve the run. The run reflects what the record now shows.
The order is deliberate. Taking him off the rota comes before checking the paperwork because the paperwork may take days to locate, and every day he is scheduled in the meantime is another day in the second part of the month. Asking the Department comes after finding the paperwork because the question is far more useful when it can name the filing date.
The run itself, and where TriblockHR fits
What is processed for days 1 to 10 is ordinary pay processing: the hours, the rate and the deductions, as for anyone else. National insurance applies to whatever is paid, regardless of nationality or permit status, from the first pay, so the employee share of 4.65% and the employer share of 6.65% apply to Rafael’s April pay as they would to anyone’s. The detail of rates and ceilings is in NIB contributions.
If the answer for days 11 to 30 has not arrived by the 25th, the employer does not have to choose between delaying everyone’s pay and guessing. Days 1 to 10 can go through the regular run, and anything decided later for the rest of the month can be handled separately once it is known.
In TriblockHR, a work permit is held as a dated document on the employee record, with its expiry date, and expiry reminders go out three days before, one day before and on the day. Documents are stored against the employee, with sign-off where needed, so the renewal application and the Department’s written answer sit with the permit they concern. Off-cycle runs exist, so if April’s pay has to be split, the second part can be run on its own once it is settled. The decision about Rafael’s days after the 10th remains the employer’s.
What this guide will not decide
Two questions are left open here, on purpose. The first is whether work may continue while a renewal is pending. The sources do not give a single answer, and we will not give one in either direction; it is the question for the Department of Immigration in step 4, asked about the specific permit.
The second is what is owed for the days after the expiry date. That may turn on whether the employment has ended, which is not a payroll question and is not settled by the sources we rely on. It is a question for the Department of Labour and the employer’s own adviser. Contracts and notice are covered in employment contracts, probation and notice, and termination in severance pay; neither is applied to Rafael here.
The way to avoid both questions is to start the renewal early: we recommend three months before expiry, which is our recommendation and not a statutory deadline. Why, and what fills that time, is in work permit renewal lead time.
Questions about a lapsed permit and the pay run
Can we keep paying an employee whose permit has lapsed while we sort it out?
Paying an employee as though they were working does not cure a lapsed permit. What is owed for days after the expiry date is not settled on our reading and may depend on whether the employment has ended; ask the Department of Labour and your adviser.
Can the employee keep working while the renewal is pending?
There is no single answer in the sources, and we do not give one. Ask the Department of Immigration about the specific permit and get the answer in writing.
Do NIB contributions still apply to someone on a work permit?
Yes. National insurance applies to whatever is paid, regardless of nationality or permit status, from the first pay: 4.65% from the employee and 6.65% from the employer.
Does TriblockHR stop the run when a permit expires?
No. It holds the permit as a dated document on the employee record and sends expiry reminders three days before, one day before and on the day. The decision about the run is the employer’s.
See how a dated permit on the employee record, with expiry reminders and off-cycle runs, keeps a lapse from becoming a pay run surprise.
- SOC 2 Type II attested
- AES-256 at rest
- 99.9% uptime
- Built in The Bahamas
